Geometry at work

SANDYFORD BRIDGES


SANDYFORD BRIDGES

The design of 6 motorway overbridges, noise walls, retaining walls, boundary treatments and landscaping. The scheme is part of the Dublin South Eastern Motorway.

The bridges include a skew span bridge (No 1) at 130 metres long, two curved overbridges and a second skew span bridge (No 5) at 180 metres long. The scheme was officially opened in June 2005.

Client: NRA and Dunlaoghaire/Rathbone County Council
Consulting Engineers: MCO’Sullivan & Co Ltd